Approve the base size on a documented fit model, then review the grade rules for coverage, support and tension—not only proportional measurements. Confirm selected edge sizes before bulk when risk is high.
Fix the fit reference
Record the base-size body measurements, garment measurements and fabric used. Changing fit models or fabric between rounds makes feedback hard to interpret.
Review negative ease deliberately
Swimwear is often smaller than the body because stretch creates fit and support. The amount should reflect fabric recovery, silhouette and target comfort.
Grade structure as well as outline
Cup position, strap length, elastic tension, gusset, rise and leg opening may need specific rules. A simple scale-up can distort support and coverage.
Check risk sizes
For a broad size range or structured product, confirm more than the base size. Prioritize sizes where support components, torso length or coverage change most.
Practical buyer checklist
Write sample feedback the next reviewer can use
The checklist below is general sourcing guidance. Swimfac reviews the actual development scope and available documentation against your brief; these examples are not a fixed commercial offer.
| Decision | What to specify | What to confirm |
|---|---|---|
| Identify the reference | Style, version, size and fit purpose | Use one current comment sheet |
| Locate the issue | Marked front/back photograph and point of measure | Describe the observation before proposing a solution |
| State the intended result | Coverage, comfort or balance you want to change | Review implications for straps, lining and support |
| Separate approved details | What must remain unchanged | Check retained details in the revised sample |
| Close the review | Written status against each issue | Reconcile the sample, drawing and specification versions |

Related questions
Is ‘make it more supportive’ enough?
No. Identify the size, location and movement involved. Include the intended result and images or measurements so pattern, lining, elastic and strap options can be evaluated.
Should the factory receive comments from every stakeholder separately?
Consolidate comments first. Resolve conflicting preferences and make clear which details are approved before requesting the next version.
