Colorful fabric rolls stored on shelving

Resources

Prepare the brief. Review the sample. Plan the order.

Use practical sourcing guides and project checklists to organize product information, sample comments and production approvals.

Hands working along the edge of a black fabric panel01 — Guide

Design handoff checklist

The product, fit, construction and commercial information a factory needs for review.

Read guide
Hands aligning a blue leaf-print panel beside a sewing machine02 — Guide

Development route guide

Compare OEM, ODM and private label responsibilities before choosing a path.

Read guide
Rows of garment workstations on a production floor03 — Guide

Supplier selection guide

Evaluate swimwear specialization, order fit, evidence and communication.

Read guide
Folded textured fabric swatches in pastel colors04 — Guide

MOQ planning guide

Model minimums by order, style, color, size, fabric and trim.

Read guide
An iron pressing dark garment fabric05 — Guide

Quality-control checklist

Turn an approved sample and specification into clear inspection points.

Read guide
Paper patterns arranged over fabric on a cutting table06 — Guide

Production timeline guide

Plan approvals, materials, bulk work, inspection and delivery on one critical path.

Read guide

Project checklists

Download and fill in your own details.

Editable text checklists help keep the product brief, sample feedback and production approval organized.

Sample revision worksheet

Record each observation, intended change, photo reference and approval status against one sample version.

Download TXT

Tech-pack preparation

A six-part handoff checklist covering views, measurements, components, artwork and approvals.

Download TXT

Project brief

Capture product references, material direction, brand details and commercial context.

Download TXT

Sample approval

Identify the sample version, consolidated comments, approved details and remaining exceptions.

Download TXT

Production readiness

Bring the approved reference, materials, order breakdown, inspection and packing instructions together.

Download TXT

Use the right document

Match your checklist to the next decision.

Before development

Use the project brief and tech-pack checklist to organize references, measurements, materials and commercial context. Explain what is known and which choices need review.

During sampling

Use the revision sheet for one consolidated round of comments. Carry approved details and open questions into the sample approval checklist.

Before bulk production

Use the production-readiness checklist to connect the approved sample, size breakdown, material status, inspection scope and packing instructions.

These editable TXT files are preparation tools, not contracts, test reports or approval records. Add your project details and agree the final documents with the production team.

Organize your project folder

Keep the right version easy to find.

A small, clearly named set of files is more useful than a long thread of conflicting references.

Review the cooperation stages →

Product and material folder

Group sketches, style references, current measurements and selected material information by SKU.

Sample review folder

Keep dated photos and consolidated feedback with the sample version they describe. Mark superseded revisions clearly.

Approval and order folder

Keep the final approval, assortment, label artwork and packing instructions together. Record exceptions rather than leaving them in separate messages.